
BATHROOM DEMOLITION
In May 2026, Demohaulic completed a selective upstairs bathroom demolition in Farmington Hills, Michigan 48335 in preparation for remodeling. Because the bathroom was located on the second floor, protecting the finished areas of the home was a key part of the job. Before demolition began, we installed protective floor covering along the path into the home and set up a zipper wall at the bathroom entrance to help contain the work area. A HEPA air scrubber was also used during demolition to help reduce airborne dust.
VIEW PROJECT









