This was a selective demolition / remodel-prep project in Bloomfield Hills. Demohaulic removed the sink and vanity, then removed the toilet and the tiled bathroom floor. The flooring work continued through the mud-set / mortar-bed layer, metal lath and felt paper until the approved assembly was taken down to the plywood subfloor.

Project overview

Bathroom Demolition Completed for Remodel Prep

Selective bathroom remodel prep including vanity, toilet and mud-set tile floor removal down to the plywood subfloor.

Location
Bloomfield Hills, MI — Oakland County
Service
Selective Bathroom Demolition
Primary work
Fixture removal + mud-set tile floor removal
The scope

Remove the approved layers.

This was a selective demolition / remodel-prep project in Bloomfield Hills. Demohaulic removed the sink and vanity, then removed the toilet and the tiled bathroom floor. The flooring work continued through the mud-set / mortar-bed layer, metal lath and felt paper until the approved assembly was taken down to the plywood subfloor.

  • Removed the sink and vanity
  • Removed the toilet
  • Removed the tiled bathroom floor
  • Removed the mud-set / mortar-bed layer, metal lath and felt paper
  • Took the flooring assembly down to the plywood subfloor
  • Bagged demolition debris, carried it out of the home and staged it outside in front of the garage
The floor assembly

Tile down to plywood.

The existing floor consisted of tile, a mud-set / mortar bed, metal lath and felt paper over the plywood subfloor. Demohaulic removed the approved floor assembly down to the plywood subfloor. The condition of the plywood was not part of the documented scope.

01Tile
02Mud-set / mortar bed
03Metal lath
04Felt paper
05Plywood subfloor
Debris handling

Bagged. Carried out. Staged.

The demolition debris was bagged, carried out of the home and staged outside in front of the garage.

Photo record

The work as shown.

These photos document the same Bloomfield Hills bathroom project. They are labeled to describe the stage shown, not presented as a manufactured before-and-after sequence.

Mud-set bathroom floor removal by Demohaulic in Bloomfield Hills, Michigan
During demolition
Bathroom flooring removed to the plywood subfloor in Bloomfield Hills, Michigan
Floor removed to subfloor
The result

Ready for the next phase.

The approved demolition was completed and the bathroom was left ready for the next phase of the remodel.