Floor prep / ceramic and porcelain tile

Tile & Flooring Removal in Metro Detroit

Tile and flooring removal is heavy, dusty prep work. Demohaulic removes the approved layers, handles the broken material, and leaves the floor open for inspection and the next installation decision.

Call about Tile & Flooring Removal 586-202-4056
What we remove

Get below the old floor.

Tile and flooring removal is heavy, dusty prep work. Demohaulic removes the approved layers, handles the broken material, and leaves the floor open for inspection and the next installation decision.

  • Ceramic and porcelain floor tile
  • Wall tile when included in a bathroom or interior scope
  • Mortar, thinset and cement board where approved
  • Flooring and approved underlayment listed for removal
Layer check

WHAT MAY BE UNDER THE TILE?

Tile may be installed over thinset, cement board, a mortar bed or another approved material. The actual removal depth should be confirmed as part of the scope. What is under the tile can only be confirmed once removal is underway, so the condition or quality of the substrate is not promised before the layers are opened.

House and access protection

Carry broken floor without scarring the home.

We plan the carry path before removing the first tile. Depending on the home, that can mean floor protection, plastic at doorways, sealed staging and smaller loads through finished areas.

Tile breakout can throw dust along thresholds and into the carry path. We choose containment, floor covering and air cleaning around the room layout and layer being removed; no single method is promised on every job.

Tile dust and sharp edges call for a route plan that matches the threshold, finished flooring and load-out distance.

Included in the scope

Leave a workable surface in view.

01

Breakout and removal of the selected floor layers

02

Loose tile, mortar and underlayment are collected into loads when disposal is included

03

Cleanup of the removal area and access route for inspection or the next trade

Debris handling and disposal

Bag the fragments and move the weight.

Tile, mortar, cement board and flooring are separated as practical, loaded into the trailer and sent through the disposal route confirmed for the scope.

Service-specific FAQs

Floor removal details to settle first.

The right answer depends on the tile bond, the underlayment and the surface the installer needs exposed.

Can you remove tile from a wall?

Yes, wall tile can be reviewed as part of a bathroom, shower or interior removal scope.

Do you remove the thinset too?

Thinset and mortar removal can be included based on the material, access and desired handoff.

Will you remove carpet or vinyl flooring?

Flooring removal can be reviewed when the material and underlayment are part of the agreed scope.

Do you repair the exposed floor?

No. We remove the approved layers; repairs, leveling and installation belong to the next trade.

Bathroom flooring removed to the plywood subfloor in Bloomfield Hills, Michigan
Real project example

BATHROOM DEMOLITION — Bloomfield Hills, MI.

On this Bloomfield Hills project, Demohaulic removed a tiled bathroom floor built over a mud-set mortar bed, metal lath and felt paper. The complete flooring assembly was removed down to the plywood subfloor and the demolition debris was bagged and carried out of the home. The verified Farmington Hills record adds another relevant floor-removal example: an upstairs mud-set assembly was carried out by hand after floor protection and containment were installed. The June 2026 Grosse Pointe Woods basement bathroom record documents adhesive and thinset removal from portions of a concrete slab by mechanical grinding. A verified June 2026 Royal Oak example documents construction debris removal after a tile installation, including porcelain cutoffs, leftover tile, empty boxes and packaging.

Our process

Find the next surface beneath the tile.

The edge, transition and layer stack tell us whether this is a tile pull, a mortar breakout or a deeper underlayment removal.

01

Send a close view

Photos of the edge, room, stairs and any floor transition help identify the layers involved.

02

Choose the removal depth

We confirm whether the scope stops at tile, includes mortar, or reaches cement board and approved underlayment.

03

Expose the next surface

The old floor leaves, the debris is hauled when included, and the installer gets a cleaner starting point.

What may be excluded

Stop where the floor prep stops.

  • Work on joists, framing or other structural layers beneath the floor is outside this removal scope.
  • Old adhesive or suspect material that may be regulated must be reviewed by a qualified specialist.
  • A licensed trade must handle any utility line that needs disconnecting before floor removal.
  • Subfloor repair, leveling, waterproofing and replacement flooring are handled by the next trade.
Related work

Clear the floor, then clear the next constraint.

Bathroom demolition, shower work and concrete removal are common neighbors when a floor scope reaches beyond tile.

Relevant service areas

Floor work where the route can handle it.

Sterling Heights, Warren and Troy homeowners can start with photos of the room, threshold, stairs and material layers.

See all Metro Detroit service areas ↗

Ready to scope it?

Get below the old flooring.

Text photos of the floor edge, transitions, thresholds and carry route to 586-202-4056 for a removal depth review.

Call about Tile & Flooring Removal: 586-202-4056

TEXT PHOTOSCALL