Verified project / Farmington Hills, Michigan 48335 / May 2026

Upstairs Bathroom Demolition in Farmington Hills, Michigan

Selective upstairs bathroom demolition with floor protection, zipper containment and HEPA air scrubbing for a remodeling handoff.

Project overview

Upstairs Bathroom Demolition With Dust Control and Floor Protection

In May 2026, Demohaulic completed a selective upstairs bathroom demolition in Farmington Hills, Michigan 48335 in preparation for remodeling. Because the bathroom was located on the second floor, protecting the finished areas of the home was a key part of the job. Before demolition began, we installed protective floor covering along the path into the home and set up a zipper wall at the bathroom entrance to help contain the work area. A HEPA air scrubber was also used during demolition to help reduce airborne dust.

Location
Farmington Hills, Michigan 48335 — Oakland County
Date
May 2026
Service
Bathroom demolition (selective, upstairs)
Primary work
Selective upstairs bathroom demolition with controlled debris handling
The scope

What Was Removed

Selective upstairs bathroom demolition with floor protection, zipper containment and HEPA air scrubbing for a remodeling handoff.

  • Toilet
  • Bathtub
  • Tub surround
  • Soffit above the tub
  • Wall insulation in the demolition area
  • Bathroom floor tile
  • Mud/concrete floor base approximately 1 inch thick
  • Metal lath
  • Felt paper
  • Associated demolition debris

Everything was removed and carried out manually, with debris bagged and taken out one bag at a time.

Heavy mud-set floor removal

Heavy Mud-Set Bathroom Floor Removal

One of the more labor-intensive parts of this project was the bathroom floor. The tile was not installed over a simple underlayment. Instead, the floor assembly consisted of about 1 inch of mud/concrete along with lath and felt paper underneath. That older-style floor system adds significant weight and takes more effort to break apart and remove than a standard tile floor. Since this was an upstairs bathroom, the debris had to be carefully carried out through the home rather than quickly wheeled out in bulk.

The control plan

Dust Containment and Controlled Demolition

Occupied-home demolition requires more than just tearing materials out. On this project, we took extra steps to help protect the rest of the home during demolition, including:

  • Floor protection from the entry route to the bathroom
  • A zippered containment wall at the bathroom entrance
  • HEPA air scrubber use during demolition
  • Controlled tear-out and debris handling
  • Material bagged and carried out by hand
Photo record

Farmington Hills upstairs bathroom demolition, documented step by step.

These eight photos document the May 2026 upstairs bathroom demolition in Farmington Hills, Michigan, from protection and containment through the finished removal.

Floor protection installed for upstairs bathroom demolition in Farmington Hills MI
Protective floor covering installed along the route through the home.
Zipper wall dust containment installed outside bathroom demolition area
Zippered containment wall set up at the bathroom entrance.
Blue upstairs bathroom before demolition in Farmington Hills Michigan
The existing bathroom before demolition.
Bathroom soffit demolition exposing framing and insulation in Farmington Hills
Soffit opened above the tub, exposing framing and insulation.
Bathroom floor demolition in progress during upstairs remodel prep
Floor demolition under way during the teardown.
HEPA air scrubber used during bathroom demolition in Farmington Hills Michigan
HEPA air scrubber running during demolition.
Upstairs bathroom demolition completed and left ready for remodel in Farmington Hills MI
After demolition — floor assembly removed back to the subfloor.
Bathroom stripped down and ready for remodel in Farmington Hills Michigan
The bathroom opened up and left ready for the next phase.
A note from the job

Unexpected Condition Found Behind the Walls

Once the walls were opened and the insulation was exposed, we encountered an infestation of ants inside the wall cavity. This was a concealed condition that was not visible before demolition began. It is a good example of how bathroom demo can uncover hidden issues that need to be addressed before rebuild work starts.

Ant activity discovered behind bathroom wall insulation during demolition
Ant activity discovered in the wall cavity behind the insulation during demolition.
The result

Bathroom Left Ready for the Next Phase

After demolition was complete, the bathroom had been stripped back for the next stage of renovation. The tub, tub surround, toilet, soffit, insulation and heavy mud-set floor were removed, leaving the area opened up and prepped for the contractor's next steps. The goal was to complete a clean, controlled demolition while protecting the home and exposing the space for remodeling.

Farmington Hills bathroom demolition

Planning a bathroom remodel in Farmington Hills?

Start with a clean, controlled demolition. Demohaulic provides bathroom demolition, tile removal and selective interior demolition throughout Metro Detroit.